project
Project presentation
As part of a national plan to create new penitentiary facilities, a project to design and build a centre for supporting people on their way out has been initiated. This penitentiary facility will contain 120 places, including 30 in a semi-liberty section.
This project requires the monitoring of the design studies, the works and the guarantee of perfect completion of the design, construction and fitting-out contract.
In this context, a public establishment mandated Assystem to carry out the follow-up of a consortium of design and realization in PMC framework. Thus, within the framework of the implementation of this real estate program, the client associated the services of Assystem (agent) and its partners* for the realization of a Technical Assistance to the Project owner.
*ARP-ASTRANCE (programmer), ANTEA (Environmental engineering), THEOREME (advice in exploitation-maintenance) and ALHYANGE Acoustics (acoustic and vibratory engineering)
Project scope
This mission required the following skills:
Project management, construction economics, planning & scheduling and technical expertise in all technical fields:
Expected client benefits
KEY FIGURES
sqm of surface
places
facility opening