Context and challenges
Faced with the worldwide increase in air traffic and the saturation of its facilities, the Emirate of Dubai plans to expand its Al Maktoum International Airport (AMIA) and make it the largest hub in the world, with a capacity of 200 million passengers per year (120 million in initial phase).
The client, a major player in the airport sector, was responsible for the scheduling and contracting for the baggage system as part of the project.
The client called on Assystem to deliver contracting support for the Baggage Handling System (BHS).
Project scope
Draft a comprehensive technical report (preliminary design), to present different solutions for baggage handling systems:
Results
Model layout proposed for optimised baggage sorting in terms of:
in figures
million passengers over the long term
FTE/year over 2 years