CONTEXT AND CHALLENGES

The western region of Saudi Arabia has launched two new large-scale wind energy projects which span a combined area of 480 km². These initiatives are a cornerstone of the Kingdom’s National Renewable Energy Program (NREP) and directly support the goals of Vision 2030, which aims to diversify the energy sector and promote sustainability.

​With secured land, strong wind resources, grid integration readiness, and compliance with international standards (including those from global financial and environmental institutions), the projects are strategically positioned for utility-scale deployment.​

In this context, Assystem was mandated to conduct pre-development studies, including permitting support, stakeholder engagement, design and technical expertise to accelerate project readiness.

Missions

The pre-development scope includes the following work packages:

  • Site Master Plan including layout and a bankable final report
  • ESIA Studies to obtain the NCEC license
  • Permitting and Stakeholder Non-objection
  • Geotechnical Surveys
  • Hydrological Assessment

Client benefits

  • Comprehensive master plan assessment including design basis, master drawings and a bankable final report with CAPEX & OPEX estimation, LCOE calculations and P90 energy yield assessment
  • ESIA reports based on IFC and NCEC standards, cumulating in obtaining the NCEC license to construct
  • Aviation study to obtain GACA permit
  • Delivery of 3D site models and high-resolution videos to support stakeholder communication 
  • Detailed geotechnical and hydrological assessment reports

Related projects

Pre-development of solar power plants in Saudi Arabia

Know more

Siting and impact studies for the construction of a Photovoltaic Plant

Know more

Project Management Consultancy - PMC - for the construction of a concentrated solar plant

Know more

A question, a project?