Context and challenges
ITER is a large energy project, aiming at developing the largest experimental fusion reactor ever built, in order to offer a safe, inexhaustible and environmentally friendly source of energy. ITER is a one-of-a-kind global collaboration involving a European Union’s joint-venture, which is bearing half the cost of the project, and six non-European countries: United States, China, India, Japan, South Korea and Russia. The project requires engineering services that are unprecedented. The entire site will have to be built from scratch, including the reactor buildings, infrastructure and power distribution systems.
In this context, ITER management has appointed a consortium, of which Assystem is part of and is performing a variety of engineering and project management activities, for the construction of equipment.
Project scope
Assystem is in charge of Construction Management as Agent for all ITER installation on buildings with equipment from international agencies.
In order to deal with technical and organisation complexities of the ITER project, Assystem has set up a consortium, in charge of:
Client benefits
in figures
people
engineering hours
years to perform studies
a question, a project?
Contact us